Cabinet refacingAdvertisement Paid placement. The consultation and any work are carried out by the remodeling company named below, who paid for this page.

Five ways to update a dated kitchen

Ranked by how much of the kitchen you actually have to tear out — from a weekend of hardware to moving the plumbing. Most people need option three and are quoted option five.

Updated September 2026 · 5 min read

One kitchen run shown before and after refacing: dated honey-oak doors on one side, white shaker doors and a pale quartz counter on the other. Advertisement
Same boxes, every surface new

A dated kitchen is not one problem, it is four — the doors, the surfaces, the hardware, and occasionally the layout. Which of those you actually have to touch decides everything else: how long you lose the room for, what it costs, and how much of your house becomes a site.

Here they are in order, cheapest and least disruptive first. Find the lowest one that solves your actual problem and stop there — going further up the list is how people end up spending a season on something a week would have fixed.

This ranking is ours — we install three of these five, so read it as the view of somebody with a stake rather than an independent survey. We have put them in the order we actually recommend them, which is not the order that pays us most.

Skip to asking for a price →

  1. Change the hardware

    New knobs and pulls on the doors you already have. An afternoon, a screwdriver, and a tape measure to get the hole spacing right.

    Worth it when the doors themselves are sound and the kitchen just reads as old. Not enough when the door style or the finish is the thing that dates the room — new pulls on tired oak is still tired oak.

  2. Paint the doors

    Properly done this means taking the doors off, degreasing, sanding, priming and spraying rather than brushing. Done badly it chips at the handles within a year and looks worse than where you started.

    Worth it when the boxes and doors are solid timber and you can live without the kitchen for a week. Not enough when the doors are laminate or thermofoil, which do not take paint reliably, or when the doors are the wrong style rather than the wrong colour.

  3. Reface: new doors, drawer fronts, hardware and finish

    The cabinet boxes stay exactly where they are and every surface you actually see is replaced. This is the option most people do not know exists, which is why they get quoted for a full remodel instead.

    Because nothing structural moves, there is no demolition, no plumbing work and no rebuilding — which is why it takes about a week rather than a season, and costs a fraction of new cabinetry.

    Worth it when the layout already works and the boxes are sound — which, in most Southern California kitchens built from the eighties on, they are. Not enough when the problem is where things are, not what they look like.

  4. New cabinets, same layout

    The old boxes come out and new ones go in where they were. The sink, the range and the plumbing stay put, so the expensive parts of a remodel are avoided.

    Worth it when the boxes are genuinely failing — water damage, sagging shelves, particle board that has swollen. Not enough when you also need the room to work differently.

  5. Full remodel: move the layout

    Walls, plumbing, electrical, the lot. The only option on this list that changes how the room actually works, and the only one that justifies the disruption of a full build.

    Worth it when the layout is the problem — the fridge blocks a walkway, there is nowhere to put anything down, two people cannot be in there at once. Overkill when you would have been happy with option three and nobody told you it existed.

The one that catches people out

Options three and five produce a kitchen that photographs almost identically. They differ enormously in time, disruption and price — and if nobody measures your boxes and tells you which one you need, you will be quoted the expensive one.

The two that get confused.
RefacingFull remodel
What changesDoors, drawer fronts, hardware, finishBoxes, layout, plumbing if it moves
Roughly how longAbout a weekMost kitchens, three weeks or less
DemolitionNoneYes
Makes sense whenThe layout works and the boxes are soundThe layout is the problem

That is the whole reason to have somebody measure before anybody quotes. If refacing is the honest answer for your kitchen, we will say so. If it is not, we will say that too, and tell you why.

About the cost

Installation is half off at the moment, across Greater Los Angeles, Orange County and Santa Clarita.

The consultation is free. The price you are given is written down before any work begins and nothing is added to it after you sign, and flexible payment options are available so the project does not have to be paid for all at once.

The questions we get asked most

How do I know which option my kitchen needs?

Somebody has to open a door and look at the boxes. Water damage, swollen particle board or sagging shelves rule refacing out; sound boxes and a layout you are happy with rule it in. It is a ten-minute answer once someone is standing in the room.

Does refacing look like a shortcut?

Not when the doors are the same quality as new cabinetry, which is the part that decides it. Every surface you can see is new — what stays is the box behind the door, which nobody sees either way.

Will the price change once you have started?

No. The price is written down before any work begins and nothing is added to it after you sign. If something unexpected turns up behind a wall, you are told before anything is done about it, not after.

Who is behind this

Payless Kitchen Cabinets is a kitchen and bath remodeler working across Southern California, with a showroom at 3614 San Fernando Road in Glendale. They do full kitchen remodels, bathrooms, and cabinet refacing, and they are the company that carries out the consultation described on this page.

Where we work

Greater Los Angeles, Orange County and the Santa Clarita Valley. If you are outside that, we will tell you rather than send somebody out.


Ask for a price

Question 1 of 6

Where is your home?

We work across Greater Los Angeles, Orange County and the Santa Clarita Valley.

How big is your kitchen?

A rough idea is fine.

Do you own the property?

The makeover offer is available to property owners.

Who is this kitchen for?

It helps match the right consultant to the project.

What kind of kitchen makeover?

Pick the closest fit — it gets tailored at the consultation.

When would you like it done?

No wrong answer — it only sets the pace.

Last step — where should we call?

Someone will call to arrange a time that suits you, usually within one business day. Nothing to decide on the phone.

No obligation, and nothing to decide on the phone — the call is only to find a time. We use your details to arrange the consultation and nothing else.

Ask Payless for a price Payless Kitchen Cabinets · free consultation, written price before anything starts

That one is probably not us

Nothing has been sent and nobody will call. If circumstances change, the page will still be here.

Reno Journal

Got it — thank you.

Your details are with us. Someone will call within one business day to find a time that suits you, and the consultation itself usually happens within the following couple of days.

What happens at the visit

  1. Somebody measures the room and looks at what is actually there.
  2. You see door styles, finishes and hardware, and what each does to the price.
  3. You get a written price before anything starts, and then we leave you to think about it.

What will not happen: nobody will ask you to sign anything that evening.

Who is coming

Payless Kitchen Cabinets will call you, and will introduce themselves by name when they do.